Progress tracking with Issue Filter Panels

Issue Filter panels offer help visualise issue progress in several ways:

Issue Filter Panel with a progress bar column

The column shows a calculated value from the Time Tracking fields: Time spent, Original estimate and Remaining estimate.

There are 2 columns available to display:

  • Progress ∑ (Time): Visualizes time logged into the issue.I

    • If the logged time has not been updated or is equal to the 'Remaining Estimate', the progress bar will be empty (grey).

    • If the logged hours are less than the 'Remaining Estimate', the progress will be displayed as a balance between green and grey.

    • If the logged hours equal ‘Original Estimate’ and there is no remaining estimate, then the progress bar will be completely filled in green.

    • If the logged hours are greater than the 'Original Estimate', the underestimated hours will be displayed in red. If the 'Remaining Estimate’ field still has values, then the remaining hours will be displayed in pink.

  • Progress ∑ (Remaining estimate): Visualizes remaining estimate of the issue.

    • If the 'Remaining Estimate' has not been updated or equals the 'Original Estimate', the progress bar will be empty (grey).

    • If the 'Remaining Estimate' values are less than the 'Original Estimate', the progress will be displayed as a balance between green and grey.

    • If the 'Remaining Estimate' is 0, the progress bar will be completely filled in green.

    • If the 'Remaining Estimate' is greater than the 'Original Estimate', the underestimated hours will be displayed in red.

Configuration

To show the field in the Issue Filter Panel, go to the ‘Issue view’ tab in the panel configuration. Select the required field in the ‘Display fields’ drop-down.

 

 